About PLN Nusantara Renewables

PLN Nusantara Renewables (NR) is the leading subsidiary of the PLN Group and PLN Nusantara Power in developing a new and renewable energy (NRE)-based electricity ecosystem. Formed as an unrestricted subsidiary, PLN NR offers a high flexibility in developing independent power producers (IPP).

As of June 2024, PLN Nusantara Renewables has 3,210 MW of power plants, of which 2,145 MW are operational, 895 MW are under construction, and 170 MW are in the development phase.

PLN NR has established eight companies, consisting of three subsidiaries and five affiliated companies. The three subsidiaries owned by PLN NR with a 51% ownership are PT Pembangkitan Jawa Bali Solar Energi (PMSE) for the Cirata Floating Solar Power Plant, PT Nusantara Sembcorp Solar Energi (NSSE) for the IKN 50 MW Solar Power Plant, and PT Nusantara Tembesi Baru Energi (NTBE) for the Tembesi Floating Solar Power Plant.

Learn More
Vision

Becoming a Leading Electricity Investment Company in Sustainable Renewable Energy

Mission

Developing investment portfolio which focus on green energy

Optimizing investment management to ensure corporate sustainability

Promoting talent in investment and sustainable energy

Portfolio

Currently, PT PLN Nusantara Renewables has a total capacity of 3,210 MW project development across Indonesia

The Trembesi Floating Solar Power Plant with a capacity of 35 MWac or 46 MWp is located at the Trembesi Reservoir, Saguling District, Batam City, Riau Islands. The Trembesi Floating Solar Power Plant is a collaboration with PT TBS Energi Utama Tbk. Currently, the Trembesi Floating Solar Power Plant is in the pre-construction preparation stage to be able to supply clean energy to the Batam area by 2025.

View Detail

.

View Detail

Batang Toru HPP 510MW is one endevaour of PT PLN Nusantara Renewables to optimize potential water resources in favour of domestic electricity. This plant is a peaker plant with the specification of water consumption by 0.24 liter per kWh. Batang Toru HPP is targeted for commercial operation in 2026 and expected to be able to directly assist Sumatera electrical system and contribute to improving renewable energy use in Indonesian Government programs.

View Detail

Cirata Floating Solar Power Plant (PLTS) 145 MWac/192 MWp is a National Strategic Project. Being the result of bilateral collaboration between Indonesia and the United Arab Emirates, this solar power plant (SPP) is the largest in Southeast Asia and the third largest in the world in terms of capacity.Inaugurated by President Joko Widodo on November 9, 2023, this Floating SPP has produced 158 GWh of green electricity from its inauguration until June 2024. It is projected that 214,000 tons of CO2 will be avoided annually by the electricity production process of this 200-hectare floating solar power plant.

View Detail

This project is a shareholder assignment project to PLN Nusantara Renewables through the PLN Nusantara Renewables GMS on March 31, 2023. In its development, PLN Nusantara Renewables collaborates with Adaro Power and Total Eren. This project will contribute to supporting Indonesia's renewable energy utilization target and net zero emission target.

View Detail

The 50 MW Nusantara Capital City Solar Power Plant (PLTS IKN) is a project assigned by shareholders to PLN Nusantara Renewables to support the electricity needs of the planned Nusantara Capital City (IKN).The PLTS IKN is one of the National Strategic Programs directed by President Joko Widodo. The construction of this installation is divided into two phases: a 10 MW capacity is being built through the synergy of subsidiaries under PLN Nusantara Power, while the remaining 40 MW is being developed by PT Nusantara Sembcorp Solar Energi (NSSE)—a Joint Venture Company owned by PLN Nusantara Renewables and SembCorp Utilities Pte. Ltd. Located at a point with the highest irradiation level in the IKN area, this power plant is projected to produce 92.8 GWh of green energy. Situated 5 kilometers from the KIPP IKN, it will become the backbone of electricity in IKN, capable of reducing 104,864 tons of CO2 emissions annually. 

View Detail

PT PLN Nusantara Renewables holds 30% shares in PT Shenhua Guohua Pembangkitan Jawa Bali (SPGJB) as JVC of Jawa 7 CFPP and also holds 30% shares in PT Guohua Taidian Pembangkitan Jawa Bali as JVC of Operating and Maintenance Company for CFPP Jawa 7. CFPP Jawa 7 constitutes a strategic project as the first and the biggest PLTU in Indonesia using boiler Ultra-Supercritical technology with low-calorie coal of 4,000 – 4,600kkal/kg AR and also with competitive tariff amounting to 4,2122 cent USD/kWh.

View Detail

This project is a mine-mouth power plant developed to support government programs in terms of local resources use to accommodate electrical system in the South Area of Sumatera. This project is targeted to operate commercially in 2026.

View Detail

Tembesi Floating Solar PV Power Plant

(35 MWac / 46 MWp)

The Trembesi Floating Solar Power Plant with a capacity of 35 MWac or 46 MWp is located at the Trembesi Reservoir, Saguling District, Batam City, Riau Islands. The Trembesi Floating Solar Power Plant is a collaboration with PT TBS Energi Utama Tbk. Currently, the Trembesi Floating Solar Power Plant is in the pre-construction preparation stage to be able to supply clean energy to the Batam area by 2025.

Karangkates Floating Solar Power Plant

(100 MWac)

.

Batang Toru HPP

(510 MW)

Batang Toru HPP 510MW is one endevaour of PT PLN Nusantara Renewables to optimize potential water resources in favour of domestic electricity. This plant is a peaker plant with the specification of water consumption by 0.24 liter per kWh. Batang Toru HPP is targeted for commercial operation in 2026 and expected to be able to directly assist Sumatera electrical system and contribute to improving renewable energy use in Indonesian Government programs.

Cirata Floating PV

(145 MWac / 192 MWp)

Cirata Floating Solar Power Plant (PLTS) 145 MWac/192 MWp is a National Strategic Project. Being the result of bilateral collaboration between Indonesia and the United Arab Emirates, this solar power plant (SPP) is the largest in Southeast Asia and the third largest in the world in terms of capacity.Inaugurated by President Joko Widodo on November 9, 2023, this Floating SPP has produced 158 GWh of green electricity from its inauguration until June 2024. It is projected that 214,000 tons of CO2 will be avoided annually by the electricity production process of this 200-hectare floating solar power plant.

Tanah Laut WPP

(70 MW)

This project is a shareholder assignment project to PLN Nusantara Renewables through the PLN Nusantara Renewables GMS on March 31, 2023. In its development, PLN Nusantara Renewables collaborates with Adaro Power and Total Eren. This project will contribute to supporting Indonesia's renewable energy utilization target and net zero emission target.

IKN Solar PV Power Plant

(50 MW)

The 50 MW Nusantara Capital City Solar Power Plant (PLTS IKN) is a project assigned by shareholders to PLN Nusantara Renewables to support the electricity needs of the planned Nusantara Capital City (IKN).The PLTS IKN is one of the National Strategic Programs directed by President Joko Widodo. The construction of this installation is divided into two phases: a 10 MW capacity is being built through the synergy of subsidiaries under PLN Nusantara Power, while the remaining 40 MW is being developed by PT Nusantara Sembcorp Solar Energi (NSSE)—a Joint Venture Company owned by PLN Nusantara Renewables and SembCorp Utilities Pte. Ltd. Located at a point with the highest irradiation level in the IKN area, this power plant is projected to produce 92.8 GWh of green energy. Situated 5 kilometers from the KIPP IKN, it will become the backbone of electricity in IKN, capable of reducing 104,864 tons of CO2 emissions annually. 

Jawa 7 CFPP

(2 x 1.050 MW)

PT PLN Nusantara Renewables holds 30% shares in PT Shenhua Guohua Pembangkitan Jawa Bali (SPGJB) as JVC of Jawa 7 CFPP and also holds 30% shares in PT Guohua Taidian Pembangkitan Jawa Bali as JVC of Operating and Maintenance Company for CFPP Jawa 7. CFPP Jawa 7 constitutes a strategic project as the first and the biggest PLTU in Indonesia using boiler Ultra-Supercritical technology with low-calorie coal of 4,000 – 4,600kkal/kg AR and also with competitive tariff amounting to 4,2122 cent USD/kWh.

Sumbagsel 1 Mine Mouth CFPP

(2 x 150 MW)

This project is a mine-mouth power plant developed to support government programs in terms of local resources use to accommodate electrical system in the South Area of Sumatera. This project is targeted to operate commercially in 2026.